ROC Meter Runs Tab

Meter Runs Tab

Meter 1-18/Station Meter

Click […] to select or create the Meter Object assigned. See the Meter section for more details.

Meter Ordering

Meter run assignments in ACM are determined by meter type and position in the run listing above. Orifice meters are to be assigned before any Turbine/Linear meters (ROCPlus 800L). 

Example: The ROC device has 2 Orifice Meters and 1 Turbine Meter. The resulting assignments would be:

  • Meter 01 = Orifice Meter

  • Meter 02 = Orifice Meter

  • Meter 03 = Turbine Meter

If an additional Orifice Meter is configured in the ROC device, the ACM assignments above would be changed to the following:

  • Meter 01 = Orifice Meter

  • Meter 02 = Orifice Meter

  • Meter 03 = New Orifice Meter

  • Meter 04 = Turbine Meter

 

For assistance, please submit a ticket via our Support Portal, email autosol.support@autosoln.com or call 281.286.6017 to speak to a support team member.