Meter Runs Tab
...
Meter 1-18/Station Meter
Click […] to select or create the Meter Object assigned. See the Meter section for more details.
Info |
---|
Meter OrderingMeter run assignments in ACM are determined by meter type and position in the run listing above. Orifice meters are to be assigned before any Turbine/Linear meters (ROCPlus 800L). Example: The ROC device has 2 Orifice Meters and 1 Turbine Meter. The resulting assignments would be:
If an additional Orifice Meter is configured in the ROC device, the ACM assignments above would be changed to the following:
|